Bairco Construction, Inc. completed the Lovell Bench Lateral Pipe Installation project for the Lovell Irrigation District. The purpose of the project was to bury 5,000 feet of open canal in 36″ PVC pipe. The work also included the construction of 7 cast-in-place concrete diversion boxes.